Tuesday, June 20, 2006

stage 3 bathroom destruction


What a transformation from livable to destructable. The plumber has finished inside for the moment. Waiting for the plasterer to measure up today. Hoping most of it will be done by the weekend. :). Then the tiler, cause the old tiles couldnt be matched up. so we have new ones going in.

stage 2 bathroomproject 19 june 2006


monday 19th june
I removed the bathroom tiles ready for the plumber to start, see next photo.

school holiday bathroom project


stage one original bathroom, we are putting in a new toilet where this vanity unit was. Turning into a total bathroom renovation .

Friday, June 09, 2006

photos of the books

The books in the last 2 photos are the sample books i made at a handmade bookbinding workshop, run by Papermakers of Victoria.
They did a fantastic job and it was a really great weekend.

handmade books part 2

handbooks i made in april 2006

These are the side views of the books I made in april at a handmade book workshop for 2 days. Orange and white is a pocket book, Brown cardboard with stitching in has pamphlet stitched pages and corrigated card cover, blue spine is a 3 piece cover with concertina insert, 2 small ones are envelope books with coptic binding, the thinner one is my trial i did at home, still got to work on the technique. The front book is japanese stab binding, black and red one is pamphlett stitched and last one is another one i made at home just for practice and made a small story in it. My first story book. a bit corny but all practice.

Sunday, June 04, 2006

my wine labels for my latest assignment


High here is a small peek at my latest assignment.
We had to design wine labels. I have used a fictictious
wine company. Just for fun.
We also had to design a poster which I have adapted the orange wine label to be used as a poster.
A shelf talker which I will take a photo of to include on site once I have finished attaching labels to the bottles tomorrow.